Employer: Farasat Energy Falat Company

 

Execution Period: December 1, 2022 – March 20, 2024

Petro Faraz Iranian Company has successfully completed the chemical acid cleaning operations for the pipelines leading to the equipment of the NGL3200 project site from December 1, 2022, to March 20, 2024, commissioned by Farasat Energy Falat Company.

 

Technical Project Description

The transmission pipelines leading to the equipment of the NGL3200 project site were highly susceptible to the formation of sulfide and oxide scales, which had reduced flow transmission efficiency and increased internal corrosion.

The acid cleaning operation was carried out to eliminate sulfide (FeS) and oxide (Fe₂O₃, Fe₃O₄) scales using customized chemical solutions, including hydrochloric acid and highly effective corrosion inhibitors. The process involved controlled injection of the acid solution, precise adjustment of temperature and flow parameters, and strict monitoring of the acid contact time with the internal surface of the pipelines to ensure optimal cleaning while preventing any additional corrosion damage.

 

Technology & Operational Precision

Relying on advanced technical knowledge, specialized equipment, and full compliance with oil and gas industry standards, Petro Faraz Iranian Company successfully completed this project with the highest quality and safety guarantees.

  • Initial evaluation and scale sampling to determine the type and level of contamination
  • Designing and formulation of the acid wash composition tailored to corrosion conditions and pipe materials
  • Execution of acid cleaning operations under strict control of temperature, contact time, and acid concentration
  • Implementation of neutralizing and final flushing processes to completely eliminate residual acids
  • Conducting Non-Destructive Testing (NDT), including ultrasonic and visual inspections

 

Key Project Actions

Initial scale evaluation and sampling
Formulation design customized to pipeline metallurgy
Precise control of temperature, time, and concentration
Neutralization and final flushing execution
Non-Destructive Testing (NDT) operations
Full quality and safety guarantee

 

Execution Period: December 1, 2022 to March 20, 2024

 

Executed with the highest safety and quality standards — Entirely successful outcomes