Employer: South Pars Gas Complex Company – 10th Refinery
Execution Period: February 19, 2025 – April 22, 2025
Petro Faraz Iranian Company, as the specialized contractor, has successfully completed the project for supplying the turboexpander power supply for the 10th Refinery of the South Pars Gas Complex (Phase 19). The project was executed from February 19, 2025, to April 22, 2025, commissioned by the South Pars Gas Complex Company – 10th Refinery.

Technical Description of the Project

The procurement of the specialized power supply was carried out in accordance with the technical specifications of the turboexpanders, aiming to guarantee voltage and current stability, reduce electrical noise, and maintain the safety of control systems under refinery environmental conditions.

This project was executed with a focus on supplying a high-quality and highly reliable power source for sensitive refinery equipment.

Results and Achievements

  • Supply of a high-quality and highly reliable power source
  • Guaranteeing stable performance and reducing the risk of equipment failure
  • Enhancing productivity and sustainability of refinery processes

Key Actions Taken

Analysis and selection of power supplies with full electrical protections (OVP, OCP, SCP)
Conducting performance and compliance tests in accordance with IEC and API standards
Supervision over delivery, installation, and commissioning of the equipment
Provision of technical documentation and after-sales support
Execution Period: February 19, 2025 to April 22, 2025
Guaranteeing voltage and current stability — Reducing electrical noise and maintaining control system safety

Relying on its technical knowledge and specialized experience, Petro Faraz Iranian Company is ready to provide electrical equipment and power supply procurement services for the oil, gas, and petrochemical industries.